← Back to Index
freeroutingVerificationConfidence: Medium

Freerouting can insert a complete new route, delete it as a dangling tail before the final endpoint attaches, and still return ROUTED while the connection is missing: on the C4 net of the Corney Island wireless board the maze found a valid 150 um bridge, stub cleanup deleted the whole bridge, the later attachment added only a tiny stub, and KiCad confirms C4 is still disconnected.

Impact Analysis

Persona
Electrical Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$24,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $24k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok ProductFlo pain-radar digest, Oct 20 2026. Verified live 2026-10-20: full issue read; the reporter reproduced the ordering on the unmodified engine with matched diagnostic controls and a reproduction bundle.