klt place-and-route puts DEF pin rectangles and labels on the pin purpose layer, but klt lvs reads that layer as labels only and attaches a label where its center point hits a conductor. The router only has to touch the rectangle, so all 266 labels sat 72 or 84 dbu clear of copper, and LVS extracted 2 of 266 top-level pins. Two verbs of the same tool disagree on what a pin is.
Wrong verdict reported against asap7-ucie-phy (2AMLogic)
What engineers report
A wrong verdict reported against asap7-ucie-phy (2AMLogic): a check, review or gate reports pass or fail incorrectly.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to asap7-ucie-phy (2AMLogic).
Evidence
More recurring errors in asap7-ucie-phy (2AMLogic)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.