← Back to Index
eos (mtmoreira)VerificationConfidence: Medium

A sky130 SRAM-bearing reference run through OpenROAD flow scripts found the macro placer with no solution so placement was manual, Magic drops a port-less macro instance from extraction so the black-box LVS had to be done on the extracted netlist, and platform config overrides the design-level CDL variable.

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 27-28 2026 (Oct 27 8:41 AM ET through Oct 28 7:41 AM ET digests plus the Haitch editions). Verified live 2026-10-28: issue/PR/thread read; title and state confirmed.