gf180-rcosc (2AMLogic)VerificationConfidence: Medium

The README says PVT, DRC/LVS-clean layout and post-layout re-verification are all done. The graded signoff report has 8 of 11 met with corners, Monte Carlo and post-layout unmet, and two ratified rows missed (post-trim accuracy outside the 1.1% budget, trim range not met).

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 28-29 2026 (Oct 28 8:41 AM ET through Oct 29 early-morning Haitch editions). Verified live 2026-10-29: issue/PR read; title and state confirmed.