Under a newer klt, LVS and ERC runners stop passing --check and one capacitor's body area reads 69.2224 where 16384.0 is recorded, so the newer tool fails the committed evidence and nobody knows which side is right. Re-minting the evidence would either hide a tool regression or lock in a wrong number.

Import, export & interop reported against gf180-sar-adc (2AMLogic)

gf180-sar-adc (2AMLogic)Simulation & verificationImport, export & interopMedium confidence

What engineers report

A import, export & interop reported against gf180-sar-adc (2AMLogic): breaks when reading, writing or converting files and data between tools.

Recorded mode: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to gf180-sar-adc (2AMLogic).

Evidence

  1. 12AMLogic/gf180-sar-adc Issue #798: Triage the LVS and ERC --check deltas under the klt release #652 targets (part of #652)github.com

More recurring errors in gf180-sar-adc (2AMLogic)

See all 2 gf180-sar-adc (2AMLogic) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.