gf180-trng drew well and substrate taps and the LVS and PEX reports now read verified and biased, but the layout and signoff READMEs still say bodies float, all 104 MOS bodies untapped, and signoff/README.md contradicts itself between two sections. Same author, same week, same pattern in three more repos: a reader of the README gets a different answer from the one the signoff record gives.

Silent failure reported against gf180-trng (2AMLogic)

gf180-trng (2AMLogic)Simulation & verificationSilent failureMedium confidence

What engineers report

A silent failure reported against gf180-trng (2AMLogic): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to gf180-trng (2AMLogic).

Evidence

  1. 12AMLogic/gf180-trng Issue #886: Layout and signoff READMEs still describe floating analog bodies; the committed LVS and PEX reports read verified and biasedgithub.com

More recurring errors in gf180-trng (2AMLogic)

See all 2 gf180-trng (2AMLogic) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.