gf180-trng drew well and substrate taps and the LVS and PEX reports now read verified and biased, but the layout and signoff READMEs still say bodies float, all 104 MOS bodies untapped, and signoff/README.md contradicts itself between two sections. Same author, same week, same pattern in three more repos: a reader of the README gets a different answer from the one the signoff record gives.
Silent failure reported against gf180-trng (2AMLogic)
What engineers report
A silent failure reported against gf180-trng (2AMLogic): reports success, or uses stale data, while the result is wrong or missing.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to gf180-trng (2AMLogic).
Evidence
More recurring errors in gf180-trng (2AMLogic)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.