← Back to Index
hive-chip-flow (Hive-RSI-Lab)VerificationConfidence: Medium

The wrapper the flow generates leaves out the VGND and VDPWR ports that Tiny Tapeout analog template expects, and nothing refuses it. A correct hand-kept project.v gets refused as untied and only ships with a waiver, which has to be redone every time the file changes. The author diffed the two by hand and calls them equivalent by inspection, not by proof.

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 31-Nov 1 2026 (Oct 31 9:41 PM ET through Nov 1 7:41 AM ET digests plus the Haitch overnight edition). Verified live 2026-11-01: issue/PR read; title and state confirmed.