← Back to Index
OpenROAD-flow-scripts (The-OpenROAD-Project)VerificationConfidence: Medium

The IHP SG13G2 LVS deck last synced in June 2024 missed the PDK top-port check, so a design with routing cut behind an IO pin still printed netlists match.

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digest, Oct 26 2026 (8:41 AM to 11:41 AM ET digests plus Haitch morning edition). Verified live 2026-10-26: issue/PR/thread read; title and state confirmed.