← Back to Index
oss-monorepo (Duncan-Haywood)VerificationConfidence: Medium

A real two-storey ArchiCAD house (KIT FZK-Haus) made the IFC reader merge upper and lower walls: 13 walls became 9, and a 1 m attic window got a 3.5 m sill measured from the lowest wall; the fix assigns walls and openings to IfcBuildingStorey and measures sills from that storey's wall base.

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 28-29 2026 (Oct 28 8:41 AM ET through Oct 29 early-morning Haitch editions). Verified live 2026-10-29: issue/PR read; title and state confirmed.