← Back to Index
sg13cmos5l-protocol-emulator (2AMLogic)VerificationConfidence: Medium

The layout did not change, but the klt 0.8.0 DRC deck checks two more rules, so a GDS graded clean on Oct 17 now has 4,484 findings, all inside the foundry SRAM macro. The met count fell from 5 to 4 while the tracker still shows item 3 as met.

Impact Analysis

Persona
Hardware Engineer
Team Size Impact
5x Multiplier
Prototype Delay
3 Days
Est. Annual Cost
$30,000
  • 1 user · 1 month240 min
  • Rest of team960 min
  • Rest of year13,200 min

monthly_minutes × 12 × team_multiplier ÷ 60 × $75/hr = $30k/yr

$75/hr assumed rate.

Annual team-minutes decomposed from the reported monthly inputs.

Evidence & Sources

1 Sources

Analyst Notes

From the Grok pain-radar digests, Oct 28-29 2026 (Oct 28 8:41 AM ET through Oct 29 early-morning Haitch editions). Verified live 2026-10-29: issue/PR read; title and state confirmed.