A layout PR regenerated the bandgap's GDS and PEX netlists. CI then failed because the audited characterization report pins those netlists by sha256, and two no longer match, which invalidates three PEX sims (PSRR, output impedance, startup trip point). The fix is a new dated report, fresh sims through the batch fleet, and a re-minted signoff manifest. Do not relax the dependency check. One layout change, and the evidence behind signoff has to be rebuilt. This is the change-impact problem, handled well, and it is still a lot of work.
Missing capability reported against sg13g2-bandgap (2AMLogic)
What engineers report
A missing capability reported against sg13g2-bandgap (2AMLogic): cannot do a step the workflow needs, so people fill the gap by hand.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to sg13g2-bandgap (2AMLogic).
Evidence
More recurring errors in sg13g2-bandgap (2AMLogic)
- The previous tracker hit GitHub's 2,500-comment limit, mostly from sweep lease comments. The new audit grades 5 of 11 items met; item 11's ERC half cites the SG13CMOS5L port's report, not an ERC of the SG13G2 block, and that report still shows 10 missing-tie findings although the issue for them was closed.Mechanical · impact 74
- PR #435 resized the NMOS mirror to w=40u l=4u in the schematic and netlists, but the layout generator still hardcodes 10u by 1u and the committed GDS, LVS reference and PEX netlist all describe the old devices. The PEX generator self-test now fails with 'no schematic XM matches gate', and every downstream result that used the as-built amp has to be rerun.Electronics & PCB · impact 66
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.