Last edits before a JLC order left the BOM and CPL untouched because they carry hand rotation fixes and part swaps, while the loose gerber files in jlc/gerbers were still from 10-30 and only the new zip was current. The files you would actually send are not the ones sitting next to the board.
Recurring agent failure issue in Battery-Bank (MidwestMotorBoy)
What engineers report
A recurring agent failure problem in Battery-Bank (MidwestMotorBoy) that mostly hits the electrical engineer.
Failure pattern: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to Battery-Bank (MidwestMotorBoy).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.