Bottom-side rotations written as top-side angles; parts at 90/270 land half a turn off their pads. The reproduction used a SOD-123 diode and a SOT-23 each placed four times, top and bottom at 0 and 90 degrees, and the export still wrote the rows after one unverified-rotation warning per part.
Import, export & interop reported against circuit-json-to-pnp-csv (tscircuit)
What engineers report
A import, export & interop reported against circuit-json-to-pnp-csv (tscircuit): breaks when reading, writing or converting files and data between tools.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 21-22 2026 (Nov 21 8:41 PM ET through Nov 22 7:41 AM ET digests). Verified live 2026-11-22: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to circuit-json-to-pnp-csv (tscircuit).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.