Board 06: fresh copper checked with its own project and rules had 213 blocking findings; the same copper with the committed sidecars had 246, 33 of them diff-pair clearance from a different project clearance floor; the committed release shows 0 under its own rules. The verdict depends on which rules file rides along with the copper.

Import, export & interop reported against kicad-tools (2AMLogic)

kicad-tools (2AMLogic)Electronics & PCBImport, export & interopMedium confidence

What engineers report

A import, export & interop reported against kicad-tools (2AMLogic): breaks when reading, writing or converting files and data between tools.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 21-22 2026 (Nov 21 8:41 PM ET through Nov 22 7:41 AM ET digests). Verified live 2026-11-22: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to kicad-tools (2AMLogic).

Evidence

  1. 12AMLogic/kicad-tools Issue #9891: Board 06: repair the seed-42 recipe to reproduce its strict release DRC resultgithub.com

More recurring errors in kicad-tools (2AMLogic)

See all 12 kicad-tools (2AMLogic) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.