On boards with copper pours, moving footprints or tracks leaves stale fill polygons, and DRC reports shorts and clearance errors that are not real. The agent's DRC never passed --refill-zones, so copperhead refused valid edits unless the user ran an outside refill script by hand. The fix refills and saves the board inside the DRC call.

Wrong verdict reported against copperhead (copperheadhq)

copperhead (copperheadhq)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against copperhead (copperheadhq): a check, review or gate reports pass or fail incorrectly.

Recorded mode: validation / false fail

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to copperhead (copperheadhq).

Evidence

  1. 1copperheadhq/copperhead PR #478: fix(kicad): support zone refill in runDrc and enable for tool handler (#469)github.com

More recurring errors in copperhead (copperheadhq)

See all 11 copperhead (copperheadhq) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.