KiCad 10's IPC Pad message has no field for pad fabrication type, so heatsink, castellated, BGA, fiducial, test point and mechanical all go missing, and any live update that sends a whole footprint back re-creates its pads without that property. Konnect had a guard for this, but three tools sent whole footprints without running it, including the footprint repair tool.

Recurring agent failure issue in Konnect (J3Techs)

Konnect (J3Techs)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in Konnect (J3Techs) that mostly hits the electrical engineer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to Konnect (J3Techs).

Evidence

  1. 1J3Techs/Konnect PR #52: Run the pad-fabrication guard on live field edits and footprint repairgithub.com

More recurring errors in Konnect (J3Techs)

See all 8 Konnect (J3Techs) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.