Moving the design from atopile to KiCad turned up datasheet errors carried over unchanged: the FB divider would have driven the 5 V output toward 12 V, EN sat on the CH224K's active-low PG and held the buck off, and R10 dissipated 161 mW in a 100 mW part. The author runs ERC, schematic parity and datasheet rules in CI and still says do not order this board yet.
Recurring agent failure issue in milsblo (arunderwood)
What engineers report
A recurring agent failure problem in milsblo (arunderwood) that mostly hits the electrical engineer.
Failure pattern: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to milsblo (arunderwood).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.