The netlist.sh --check script failed on main because committed netlists lack mm_ok=1, which the newer installed PDK emits, while CI is green because netlist.yml pins the PDK to the last commit before upstream started emitting it. The host had a newer PDK, two environments disagreed, and the first report blamed main.

Recurring agent failure issue in sg13g2-pll (2AMLogic)

sg13g2-pll (2AMLogic)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in sg13g2-pll (2AMLogic) that mostly hits the electrical engineer.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to sg13g2-pll (2AMLogic).

Evidence

  1. 12AMLogic/sg13g2-pll Issue #309: design/sg13cmos5l: committed netlists stale vs installed PDK (mm_ok=1 missing); netlist.sh --check fails on maingithub.com

More recurring errors in sg13g2-pll (2AMLogic)

See all 2 sg13g2-pll (2AMLogic) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.