Asked for relay switch boards with no MCU, the AI board compiler pulled the button up to the board's 12 or 24 V VIN and switched it to GND, even on an optocoupler-isolated board, which joined GND_IN to GND. The fix adds a VCC_IN pin for the controller's 3.3 or 5 V and returns the switch to GND_IN.

Recurring agent failure issue in si-eda (srinivasan-fh)

si-eda (srinivasan-fh)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in si-eda (srinivasan-fh) that mostly hits the electrical engineer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to si-eda (srinivasan-fh).

Evidence

  1. 1srinivasan-fh/si-eda PR #349: si-pcblm: relay switch boards plan no button; buttons stay on the controller's sidegithub.com

More recurring errors in si-eda (srinivasan-fh)

See all 4 si-eda (srinivasan-fh) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.