DigiKey sold through 490 units of C11's Murata cap within hours of a part swap; Mouser had 17,858. Moving the supplier part number tripped the repo's own consistency check, because Mouser abbreviates long Murata numbers. Rather than loosen the matcher, which had caught two real wrong-part failures before, the author added a ledger of live-verified MPN/P/N pairs and self-tests that keep the old failures out of it.

Wrong verdict reported against solar-business-card (devinhorowitz)

solar-business-card (devinhorowitz)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against solar-business-card (devinhorowitz): a check, review or gate reports pass or fail incorrectly.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to solar-business-card (devinhorowitz).

Evidence

  1. 1devinhorowitz/solar-business-card PR #267: C11: source from Mouser; check [20] learns distributor abbreviationsgithub.com

More recurring errors in solar-business-card (devinhorowitz)

See all 3 solar-business-card (devinhorowitz) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.