A parts-research agent setup where agent instruction files disagreed with each other: one said a pin order read off a package drawing counts as verified, two others said it does not. A stored part record carried a wrong 12 V limit note and project-specific irrigation wording into a generic shelf entry, and a doc claimed DFRobot ships no KiCad footprints when one does. Part knowledge kept by agents drifts the same way human wikis do, just faster.
Wrong design output reported against spark (xmejkal)
What engineers report
A wrong design output reported against spark (xmejkal): produces incorrect geometry, routing, values or parts.
Recorded mode: agent / failure
Analyst note
From the Grok pain-radar digests, Nov 11-12 2026 (Nov 11 8:41 AM ET through Nov 12 5:41 AM ET digests plus the Haitch editions). Verified live 2026-11-12: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to spark (xmejkal).
Evidence
More recurring errors in spark (xmejkal)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.