The robot's generated controller schematic and PCB still carry a CH32V307 (7 matches in the schematic), and the electrical spec budgets a "CH32V307 and logic" load on 3V3. The BSP manifest has already moved to an STM32G474RET6 and lists the MCU change as unresolved. The generators will keep producing the old part until the part data changes, so the release-readiness gate is reporting on a board nobody plans to build.
Recurring agent failure issue in workbench-mobile-home-robot (Quchaosheng)
What engineers report
A recurring agent failure problem in workbench-mobile-home-robot (Quchaosheng) that mostly hits the electrical engineer.
Failure pattern: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 11-12 2026 (Nov 11 8:41 AM ET through Nov 12 5:41 AM ET digests plus the Haitch editions). Verified live 2026-11-12: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to workbench-mobile-home-robot (Quchaosheng).
Evidence
More recurring errors in workbench-mobile-home-robot (Quchaosheng)
- A robot BSP readiness gate counted as PASS as soon as its evidence path pointed at any file in the repo, so README.md could mark all nine gates PASS and set physical_release_ready to true.Verification · impact 74
- Six safety-critical nets, including GND_PWR, MOTOR_ENABLE_SAFE, and both e-stop returns, could be marked physically VERIFIED with hardware/pcb/README.md as the evidence, because the only check was that the file existed.MCAD · impact 74
- The release-gate check accepted any status string and accepted pass: false, so a package truthfully saying it was not complete was read as valid approval evidence. The fix gives each package its own status vocabulary and requires pass to be true.MCAD · impact 74
- Simulation runs got a random uuid as identity, so two runs of the same world could not be compared, and the path a caller asked for and the world actually loaded could silently differ.Verification · impact 66
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.