Most first robots start from a kit someone already bought, such as six STS3215s and a Pi, but Basecase priced every design as if everything had to be bought. Now owned parts count at $0, exports show owned beside to-buy, and the agent picks owned parts first and can record counts from pasted order confirmations. Inventory was living outside the design. Third basecase BOM item today after #305 and PR #583.

Missing capability reported against basecase (JamelHammoud)

basecase (JamelHammoud)MechanicalMissing capabilityMedium confidence

What engineers report

A missing capability reported against basecase (JamelHammoud): cannot do a step the workflow needs, so people fill the gap by hand.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to basecase (JamelHammoud).

Evidence

  1. 1JamelHammoud/basecase PR #581: Refine: Count parts on hand at $0 in the BOM and Budget, and have the agent use them firstgithub.com

More recurring errors in basecase (JamelHammoud)

See all 4 basecase (JamelHammoud) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.