An SO-101 with six servos already on hand read about $127.48 instead of about $7.48, because the BOM priced every part as if bought again. The fix adds owned counts to the BOM, the budget, exports and the agent's get_bom/record_on_hand tools.
Wrong design output reported against basecase (JamelHammoud)
What engineers report
A wrong design output reported against basecase (JamelHammoud): produces incorrect geometry, routing, values or parts.
Recorded mode: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to basecase (JamelHammoud).
Evidence
More recurring errors in basecase (JamelHammoud)
- In a robot-design tool, the BOM added one generic 5264 cable pack whenever a scene had a servo, with no count, no connector match and the wrong cable for DYNAMIXEL robots. Now the wiring netlist comes from connector ports, the BOM counts one cable per servo bus hop of the right type, and a new check blocks a build when no adapter takes a servo's connector. The mechanical scene and the purchasing list were not talking until they wired a netlist between them.Mechanical · impact 66
- In basecase, the only way to mark a part as not printed was a CNC aluminum or laser-cut tag, and both listed the part as needing a source, so Checks counted it as a blocker. The new sheet option feeds the sheet's density into weight, servo torque and the MJCF, adds a Sheet BOM section and exports one DXF per part, and a part set to sheet that is not flat gets blocked.Mechanical · impact 66
- Most first robots start from a kit someone already bought, such as six STS3215s and a Pi, but Basecase priced every design as if everything had to be bought. Now owned parts count at $0, exports show owned beside to-buy, and the agent picks owned parts first and can record counts from pasted order confirmations. Inventory was living outside the design. Third basecase BOM item today after #305 and PR #583.Mechanical · impact 66
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.