An SO-101 with six servos already on hand read about $127.48 instead of about $7.48, because the BOM priced every part as if bought again. The fix adds owned counts to the BOM, the budget, exports and the agent's get_bom/record_on_hand tools.

Wrong design output reported against basecase (JamelHammoud)

basecase (JamelHammoud)MechanicalWrong design outputMedium confidence

What engineers report

A wrong design output reported against basecase (JamelHammoud): produces incorrect geometry, routing, values or parts.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to basecase (JamelHammoud).

Evidence

  1. 1JamelHammoud/basecase PR #620: Refine: Count the parts you already own in the BOM, Budget and agentgithub.com

More recurring errors in basecase (JamelHammoud)

See all 4 basecase (JamelHammoud) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.