The base and top frame put matched diameter 1.004 sockets on an 8.820 in row spacing, while the inventory gives the mill 8.75 in of Y travel and 7.5 in of throat, so each face needs two clampings rotated 180 degrees on parts that must slide together by hand with .004 clearance. A sister issue, #2392, found assembly sheets calling for a 20.86 in reading, a digital angle gauge, a 5 to 6 in micrometer and feeler leaves, none of which are in inventory.

Recurring agent failure issue in harmonic-analyzer (pedropaulovc)

harmonic-analyzer (pedropaulovc)MCADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in harmonic-analyzer (pedropaulovc) that mostly hits the mechanical designer.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to harmonic-analyzer (pedropaulovc).

Evidence

  1. 1pedropaulovc/harmonic-analyzer Issue #2386: fr-harmonic-base / fr-top-frame: matched socket pattern 15.512 x 8.820 exceeds the mill's 8.75 in Y travel; transfer-bore the pairgithub.com

More recurring errors in harmonic-analyzer (pedropaulovc)

See all 23 harmonic-analyzer (pedropaulovc) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.