A BOM-sharing tool compresses geometry from SolidWorks but not from FreeCAD/STEP, so big assemblies drop out of single-file sharing. On large STEP assemblies the GLB runs to several hundred MB, which pushes the shareable BOM page past its 400 MB limit and splits it into HTML plus a separate file. The owner says single file is the main thing people like, and it disappears on exactly the big assemblies that most need sharing.
Recurring agent failure issue in pictureBOM (deereeco)
What engineers report
A recurring agent failure problem in pictureBOM (deereeco) that mostly hits the mechanical designer.
Failure pattern: validation / geometry
Analyst note
From the Grok pain-radar digests, Nov 10-11 2026 (Nov 10 8:41 AM ET through Nov 11 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-11: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to pictureBOM (deereeco).
Evidence
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.