A SolidWorks MCP bridge returned success JSON and even a normal-looking PDF export while the live document was wrong: a sketch asked for the Right plane silently landed on Front, and a macro call reported success=False with zero errors while never running. Only visual inspection inside SolidWorks itself revealed it.

Silent failure reported against SolidWorks MCP bridge (alisamsam/Solidworks-MCP)

SolidWorks MCP bridge (alisamsam/Solidworks-MCP)MechanicalSilent failureMedium confidence21 tools help

What engineers report

A silent failure reported against SolidWorks MCP bridge (alisamsam/Solidworks-MCP): reports success, or uses stale data, while the result is wrong or missing.

Recorded mode: agent / false success

Analyst note

From the 2026-10-06 pain-radar digest (finding 1): external user ran the bridge end-to-end against real SolidWorks 2024, documented 9 bugs with verbatim quotes, zero maintainer response recorded. Joins the 21+ source false-success cluster, now cross-platform (FreeCAD and SolidWorks COM). Cost model assumes every agent-run feature must be visually re-verified in the live document.

What it costs a team

Modeled annual cost

$18,000

For a team of 5

Prototype delay

2 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 2 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $75/hour = $18,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

Evidence

  1. 1Solidworks-MCP issue #5: 9 end-to-end bugs where mock tests pass but the live SolidWorks document is wronggithub.com

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.