Roughly half an FRC bill of materials is purchased, not manufactured: motors, bearings, sprockets, belts, swerve modules, chain, fasteners. The team's Onshape-to-shop board only tracks parts released from a Part Studio, so the purchasing half of the season still lives in whatever spreadsheet it lived in before, and nothing connects the drivetrain needs 8 of these to we have 5 in the cabinet.

Recurring agent failure issue in hawk-shop (FRC2713)

hawk-shop (FRC2713)PDMAgent failureMedium confidence

What engineers report

A recurring agent failure problem in hawk-shop (FRC2713) that mostly hits the product manager.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to hawk-shop (FRC2713).

Evidence

  1. 1FRC2713/hawk-shop Issue #15: COTS parts, team inventory, and orderinggithub.com

More recurring errors in hawk-shop (FRC2713)

See all 5 hawk-shop (FRC2713) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.