The docs said U_C was DNP, but the board file had DNP, exclude-from-BOM and exclude-from-pos all false, so following the docs JLCPCB would have soldered a LoRa module the BOM says is absent. The order sheet said top side, economic PCBA, all placements are top, while 4 of 23 placements are bottom side, and ordering single-sided would have returned ten boards with dead solar inputs.

Recurring agent failure issue in balloon-fresh (felixfelix-bot)

balloon-fresh (felixfelix-bot)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in balloon-fresh (felixfelix-bot) that mostly hits the electrical engineer.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to balloon-fresh (felixfelix-bot).

Evidence

  1. 1felixfelix-bot/balloon-fresh PR #496: fix(fab): U_C DNP on the board itself; order sheet claimed 'all top' but 4 diodes are bottom-sidegithub.com

More recurring errors in balloon-fresh (felixfelix-bot)

See all 25 balloon-fresh (felixfelix-bot) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.