On a 40 x 40 mm board, edakit route all reported both GND pours ok, then no-copper on both, and said the bridge refuses every further fill until EasyEDA restarts. Saving, restarting and rerunning gave the same result twice, even though GND pads sit under both pours. What worked was manual: create pours, save, restart EasyEDA, then call the rebuild once per pour id in a set order, then put the tooling holes back.

Recurring agent failure issue in edakit (tgd1975)

edakit (tgd1975)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in edakit (tgd1975) that mostly hits the electrical engineer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to edakit (tgd1975).

Evidence

  1. 1tgd1975/edakit Issue #336: Feature proposal: Pours fill on easyeda-mcp-pro 1.8.0github.com

More recurring errors in edakit (tgd1975)

See all 33 edakit (tgd1975) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.