Held over from the Nov 12 6:41 AM ET sweep, which was written but never sent. The robot's gate checklist says there is still no single installed model, the dock and charger board are missing from the print folder, netlist and BOM, and the BOM still buys the old chest pad.

Missing capability reported against Open_Duck_Mini_v2 (aaltaay)

Open_Duck_Mini_v2 (aaltaay)Electronics & PCBMissing capabilityMedium confidence

What engineers report

A missing capability reported against Open_Duck_Mini_v2 (aaltaay): cannot do a step the workflow needs, so people fill the gap by hand.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to Open_Duck_Mini_v2 (aaltaay).

Evidence

  1. 1aaltaay/Open_Duck_Mini_v2 PR #44: Update the gate 0 checklist from PRs 34 to 43github.com

More recurring errors in Open_Duck_Mini_v2 (aaltaay)

See all 3 Open_Duck_Mini_v2 (aaltaay) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.