A bench power supply board meets every bar it was given: KiCad's only errors are the reference design's, nothing unconnected, pad spacing above 1.36 mm. Two separate part-by-part reviews still say don't send it to fab. Output-net copper runs 0.31 mm from a meter's mounting hole edge, where an M3 head or standoff will sit on it. Nothing in the board rules knows where the mechanical hardware goes.

Wrong verdict reported against pkidl (feastorg)

pkidl (feastorg)Electronics & PCBWrong verdictMedium confidence

What engineers report

A wrong verdict reported against pkidl (feastorg): a check, review or gate reports pass or fail incorrectly.

Recorded mode: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 14-15 2026 (Nov 14 8:41 PM ET through Nov 15 1:41 AM ET digests plus the Haitch edition). Verified live 2026-11-15: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to pkidl (feastorg).

Evidence

  1. 1feastorg/pkidl Issue #90: The bench supply, gone over part by part: what stands between it and fabricationgithub.com

More recurring errors in pkidl (feastorg)

See all 4 pkidl (feastorg) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.