Power board routing stalled with about 150 nets open. Gate clamp zeners sat about 15 mm from their FETs and 65 GND pads had no path to the plane, and the review fixes have not yet been run in KiCad.

Recurring agent failure issue in roark (jaylamping)

roark (jaylamping)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in roark (jaylamping) that mostly hits the electrical engineer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to roark (jaylamping).

Evidence

  1. 1jaylamping/roark PR #19: power-board: gate parts at the FET gates, GND fanout and rail trunksgithub.com

More recurring errors in roark (jaylamping)

See all 11 roark (jaylamping) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.