Renaming one footprint on a buck board meant the schematic, both BOMs, the kit row and the position file all had to follow. The trigger was cost: four 0.2 mm thermal vias were the board's only holes under 0.3 mm, and a 0.2 mm smallest drill roughly doubles the fab's price. Moving them to 0.3 mm meant a new board-local footprint, and the rename cascaded into five places.

Recurring agent failure issue in roark (jaylamping)

roark (jaylamping)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in roark (jaylamping) that mostly hits the electrical engineer.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 10-11 2026 (Nov 10 8:41 AM ET through Nov 11 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-11: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to roark (jaylamping).

Evidence

  1. 1jaylamping/roark PR #41: buck12: U1 thermal vias at 0.3 mm, smallest drill 0.3 mmgithub.com

More recurring errors in roark (jaylamping)

See all 11 roark (jaylamping) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.