Two farm jobs waited 900 s for the SolidWorks connector, logged that they still were not connected, and built anyway. One held a seat 16.8 minutes for about 2 minutes of work. The other died 9 s in with failed to insert native hole callout, twice, and failed the build. The readiness check is documented as best effort, so failures are logged and swallowed.

Recurring agent failure issue in harmonic-analyzer (pedropaulovc)

harmonic-analyzer (pedropaulovc)MCADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in harmonic-analyzer (pedropaulovc) that mostly hits the mechanical designer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to harmonic-analyzer (pedropaulovc).

Evidence

  1. 1pedropaulovc/harmonic-analyzer Issue #769: ensure_ready builds on a SolidWorks whose connector never loaded; fail fast instead (ch_rocker_arm hole callout)github.com

More recurring errors in harmonic-analyzer (pedropaulovc)

See all 23 harmonic-analyzer (pedropaulovc) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.