Before a fix, a CAD-to-FEA shell pipeline left 190 damaged surface files open without saying so and wrongly welded 98 more, across a 2,212-file test set. The hexera branch adds a sewing ladder, catches faces written twice, and lets notes like 'stitch gaps up to 0.5 mm' set the limit. Afterwards: 0 silent, 0 wrongly welded.

Recurring agent failure issue in hexera-platform (hexera-core)

hexera-platform (hexera-core)MCADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in hexera-platform (hexera-core) that mostly hits the mechanical designer.

Failure pattern: agent / silent failure

Analyst note

From the Grok pain-radar digests, Nov 10-11 2026 (Nov 10 8:41 AM ET through Nov 11 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-11: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to hexera-platform (hexera-core).

Evidence

  1. 1hexera-core/hexera-platform PR #438: Shell input: clean surface files by rule, IGES copies staged as their STEP (SURF-8..11, SHELL-15j..m)github.com

More recurring errors in hexera-platform (hexera-core)

See all 9 hexera-platform (hexera-core) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.