A homemade BOM workflow tool reads exports where the source system wrote '?' in place of dashes, so ADM6-60-01.5-L-4-2-A-TR arrives as ADM6?60?01.5?L?4?2?A-TR. That string goes to the Material_Master lookup and its _SANMINA retry, the part is not found, and the row asks for a new P/N.
Recurring agent failure issue in migo (Sepiolina)
What engineers report
A recurring agent failure problem in migo (Sepiolina) that mostly hits the mechanical designer.
Failure pattern: validation / failure
Analyst note
From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to migo (Sepiolina).
Evidence
More recurring errors in migo (Sepiolina)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.