An internal BOM tool reading Priority ERP shortage workbooks. Users send two layouts: a long export with data from row 168, and a short one with data from row 4. The config read fixed positions from a sheet that had to be named Shortage, so the short file gave wrong priorities or none, and a renamed sheet failed. The fix finds columns by header text and refuses a file with no priorities instead of silently returning an empty result. Checked against real files with 3,964 and 4,128 entries.

Recurring agent failure issue in migo (Sepiolina)

migo (Sepiolina)PDMAgent failureMedium confidence

What engineers report

A recurring agent failure problem in migo (Sepiolina) that mostly hits the product manager.

Failure pattern: validation / silent failure

Analyst note

From the Grok pain-radar digests, Nov 11-12 2026 (Nov 11 8:41 AM ET through Nov 12 5:41 AM ET digests plus the Haitch editions). Verified live 2026-11-12: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to migo (Sepiolina).

Evidence

  1. 1Sepiolina/migo PR #33: BOM: read any Priority layout; pick sheets by number or a list of choicesgithub.com

More recurring errors in migo (Sepiolina)

See all 2 migo (Sepiolina) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.