sky130-gcedram justified keeping an older generation pin with a committed sentence: per-layer XOR empty on all 10 layers, but the Builder agent reported it and the Judge agent recorded it as not re-measured. The PR also swapped a mechanical pin-equality test for assertions that the prose contains certain text. A geometry equivalence claim lives in a JSON field, measured by the builder agent, never re-derived.
Wrong design output reported against sky130-gcedram (2AMLogic)
What engineers report
A wrong design output reported against sky130-gcedram (2AMLogic): produces incorrect geometry, routing, values or parts.
Recorded mode: validation / geometry
Analyst note
From the Grok pain-radar digests, Nov 13-14 2026 (Nov 13 10:41 AM ET through Nov 14 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-14: issue/PR read; title and state confirmed.
What it costs a team
Modeled annual cost
$30,000
For a team of 5
Prototype delay
3 days
Modeled schedule slip per occurrence
Time lost
240 min
Per engineer per month, about 1 incidents
How the cost is modeled
240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000
A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.
Engineering tools that address it
No engineering tool profile lists this error yet. Browse tools that connect to sky130-gcedram (2AMLogic).
Evidence
More recurring errors in sky130-gcedram (2AMLogic)
Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.