A 48 V to 2 V, 100 A converter first article has three documents with three answers: the capacitor selection table picks 15 x 470 uF (7.05 mF) while the V3 simulation deck uses 4 mF, the deck has Lr at 0.92 uH against a 1.0 uH design target, and simulated Vout is 1.8867 V against a 2 V plus or minus 2 percent spec. The board is still marked NOT_FOR_FAB.

Recurring agent failure issue in CZY (czy0126)

CZY (czy0126)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in CZY (czy0126) that mostly hits the electrical engineer.

Failure pattern: validation / failure

Analyst note

From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to CZY (czy0126).

Evidence

  1. 1czy0126/CZY Issue #4: [P0][唯一执行入口] D1 主功率PCB G1→G2→G3(WIP≤3;非阻塞事项后置)github.com

More recurring errors in CZY (czy0126)

See all 14 CZY (czy0126) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.