zudo-pd (Takazudo) errors
3 recurring problems engineers report in zudo-pd (Takazudo), ranked by impact.
#217 by errors trackedECAD
Recurring zudo-pd (Takazudo) errors, by impact
- 1Three power scripts call 1.2, 0.8 and 0.5 A rated while the accepted contract says 1.7, 1.6 and 0.3 A continuous.ECAD · Agent failure · 1 report74
- 2A board revision lacked thermal spreading at three parts and had a decoupling cap far from its IC, and the reports were not bound to the actual copper. The PR binds current, loop, thermal and power reports to the native copper, rejects stale evidence or changed manufacturing geometry, and keeps a retired 15 V power story out of the PD20 exports.ECAD · Agent failure · 1 report66
- 3Main was red on a test no CI job ran. The committed supply-capability report was last written Oct 31. Two commits on Nov 1 changed its inputs, one rewrote the power budget and one adopted new resistor and capacitor parts for Board B. The report's computed values turned out unchanged, only its two input hashes were stale, but nobody knew until someone ran the test by hand. The PR adds the gate to CI and the local pre-push script. A derived engineering report that can drift from its inputs with no alarm.ECAD · Agent failure · 1 report66
How it fails
Sourced from public community reports. Costs and delays on individual entries are modeled estimates, not measurements.