Boards that draw controlled-impedance copper as zones skip the checks: check_diffpair says coupling not evaluated, dfm_release reports min_trace_width_mm null. On zcoupon a pair zone was shaved to 0.1043 mm against a 0.127 mm fab floor, and DRC passed because the fill keeps clearance.

Recurring agent failure issue in hive-hwde (Hive-RSI-Lab)

hive-hwde (Hive-RSI-Lab)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in hive-hwde (Hive-RSI-Lab) that mostly hits the electrical engineer.

Failure pattern: agent / false pass

Analyst note

From the Grok pain-radar digests, Nov 8-9 2026 (Nov 8 8:41 AM ET through Nov 9 6:41 AM ET digests plus the Haitch editions). Verified live 2026-11-09: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to hive-hwde (Hive-RSI-Lab).

Evidence

  1. 1Hive-RSI-Lab/hive-hwde Issue #890: Zone copper is never measured: width/clearance floors and pair coupling skip boards drawn in fillsgithub.com

More recurring errors in hive-hwde (Hive-RSI-Lab)

See all 60 hive-hwde (Hive-RSI-Lab) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.