On a real board the whole chain passed: check, cross-gate DRC, creepage, readiness READY, human sign-off, cart saved at JLCPCB. Then the owner opened the fab's gerber viewer and found the design unbuildable, with solder-mask openings missing and anchor holes in the wrong place. The tool records the human sign-off before the gerbers are even uploaded, so the name on the manifest vouched for a review that had not happened.

Recurring agent failure issue in kicad-tools (rjwalters)

kicad-tools (rjwalters)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in kicad-tools (rjwalters) that mostly hits the electrical engineer.

Failure pattern: agent / false pass

Analyst note

From the Grok pain-radar digests, Nov 11-12 2026 (Nov 11 8:41 AM ET through Nov 12 5:41 AM ET digests plus the Haitch editions). Verified live 2026-11-12: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to kicad-tools (rjwalters).

Evidence

  1. 1rjwalters/kicad-tools Issue #8818: tapeout-sign-off is recorded before the fab gerber-viewer review it should attest togithub.com

More recurring errors in kicad-tools (rjwalters)

See all 62 kicad-tools (rjwalters) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.