The kct check and kct readiness commands now warn when there is no .kicad_pro, or only the stock one pcbnew writes, so a DRC clean result is not quietly measured against default rules. Earlier the same day a renamed board copy lost its custom rules the same way, 537 violations against 16.

Recurring agent failure issue in kicad-tools (rjwalters)

kicad-tools (rjwalters)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in kicad-tools (rjwalters) that mostly hits the electrical engineer.

Failure pattern: agent / failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to kicad-tools (rjwalters).

Evidence

  1. 1rjwalters/kicad-tools PR #8648: feat: warn on missing or stock-default DRC project rulesgithub.com

More recurring errors in kicad-tools (rjwalters)

See all 62 kicad-tools (rjwalters) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.