The attested negative-control script targets two subcircuits that are gone from the netlist it reads, after a design decision replaced the first prescaler stage, and eight unused schematic and symbol files from before that decision are still in the tree. A check that silently tests nothing still reads as passing.

Recurring agent failure issue in sg13g2-lc-pll (2AMLogic)

sg13g2-lc-pll (2AMLogic)ECADAgent failureMedium confidence

What engineers report

A recurring agent failure problem in sg13g2-lc-pll (2AMLogic) that mostly hits the electrical engineer.

Failure pattern: agent / silent failure

Analyst note

From the Grok pain-radar digests, Nov 9-10 2026 (Nov 9 7:41 AM ET through Nov 10 7:41 AM ET digests plus the Haitch editions). Verified live 2026-11-10: issue/PR read; title and state confirmed.

What it costs a team

Modeled annual cost

$30,000

For a team of 5

Prototype delay

3 days

Modeled schedule slip per occurrence

Time lost

240 min

Per engineer per month, about 1 incidents

How the cost is modeled

240 min/month × 5 engineers × 12 months = 240 hours × $125/hour = $30,000

A modeled estimate with medium confidence. Swap in your own team size and loaded rate to size it for your team.

Engineering tools that address it

No engineering tool profile lists this error yet. Browse tools that connect to sg13g2-lc-pll (2AMLogic).

Evidence

  1. 12AMLogic/sg13g2-lc-pll Issue #171: Fix stale prescaler-g1 negative control; decide on 8 unused pre-DR-005 cell filesgithub.com

More recurring errors in sg13g2-lc-pll (2AMLogic)

See all 6 sg13g2-lc-pll (2AMLogic) errors

Sourced from public community reports. Costs and delays are modeled estimates, not measurements. Know a better source or a fix? Tell us at hello@productflo.io.